WWTP inspection

Every small wastewater treatment plant (WWTP) of up to 50 population equivalent (PE, Slovak EO) must have a regular technical inspection (technická revízia), and the report must reach the district office (okresný úrad) by 30 January. We have a certified inspection technician (revízny technik) in our own company, so you can meet this obligation with a single visit.

By 30 Januaryleft to submit the technical inspection report to the district office
  • Certified inspection technician
  • All WWTP brands
  • Report for the district office
  • All of Slovakia by agreement
REPORT
On this page

Our certified inspection technician

Certificate of an inspection technician for small wastewater treatment plants in the name of Daniel Bednár, issued by the Slovak University of Technology in Bratislava
Official certificate

Daniel Bednár, certified inspection technician

Certificate for checking the condition and functioning of small wastewater treatment plants up to 50 population equivalent (PE). Issued by the Slovak University of Technology in Bratislava (STU) on 16 January 2024.

  • examination before an STU board
  • entry in the list of inspection technicians
  • the company’s managing director carries out inspections in person

Date of birth, address and signature are hidden in the image to protect privacy. The technician will be happy to show you the original.

What the law requires

The inspection is the plant owner’s obligation, not a manufacturer’s recommendation. It has applied since 1 January 2023 to every small WWTP, regardless of its age or brand.

QuestionAnswer
How oftenonce a year, or once every 2 years with remote monitoring
Who carries it outonly a certified inspection technician
Who receives the reportthe district office, department of environmental care (odbor starostlivosti o životné prostredie)
Deadlineby 30 January of the following year
Deficienciesmust be remedied within 60 days of the inspection

Source: Water Act (Act No. 364/2004 Coll.), Section 53(2).

How the inspection works

  1. 1BookingWe agree a date and tell you what to prepare.
  2. 2Technician’s visitOn-site check of the condition, the operation and the operating log.
  3. 3ReportYou receive the technical inspection report.
  4. 4Submission to the authorityThe report goes to the district office by 30 January.

How much does a WWTP inspection cost

One price that you know in advance. Prices include VAT.

Inspection

129 €

  • technical inspection by a certified technician
  • sludge settling test
  • photo documentation
  • technical inspection report
  • we submit the report to the authority for you
  • operating log template
  • travel within the zone

Inspection + analysis

from €179

  • everything in the Inspection package
  • accredited sampling
  • BOD5, COD and TSS analysis
  • laboratory test report

Annual subscription

€119 per year

  • inspection every year
  • reminder before the deadline
  • priority appointment
  • discount on the analysis

Businesses and guesthouses

price on request

  • inspection and analysis
  • annual contract
  • VAT invoice

The price does not include repairs, replacement of the diaphragms (blower membranes) or the air blower, desludging, or travel outside the zone. Which water analyses you need is set by your permit from the district office.

Why choose us for your inspection

All WWTP brands

The manufacturer does not need to authorise the inspection. We also inspect plants that you did not buy from us.

Paperwork sorted

You receive the report, and on request we submit it to the district office for you.

Log template

No operating log (prevádzkový denník)? You will receive a template with the inspection.

Frequently asked questions

Do I need an inspection even if my plant is working?

Yes. The obligation applies to the owner of every small WWTP of up to 50 PE, whether or not the plant runs without problems.

How often is an inspection needed: every year or once every 2 years?

Once a year. Once every two years is enough if the plant has remote monitoring.

When and to whom do I submit the report?

To the district office, department of environmental care, by 30 January of the following year.

What if I do not have an operating log?

Tell us when you book. You will receive a template with the inspection, and we will advise you on how to complete it.

Is a water analysis included in the price?

Not in the basic package. The analysis is part of the Inspection + analysis package. Its scope is set by your permit.

What if the inspection finds deficiencies?

They must be remedied within 60 days of the inspection. We can resolve most of them during a service visit.

What is the fine for a missing inspection?

Up to €165 for a private individual, and €500 to €3,300 for a company or sole trader.

I have a cesspool (sealed holding tank). Does this apply to me?

No, the inspection does not apply to cesspools. However, the municipality or the district office may ask you for proof of emptying for up to the last two years.

Why choose Bednár Montáže

  • Certified inspection technicianInspections are carried out by Daniel Bednár, who is on the Slovak University of Technology (STU) list of inspection technicians.
  • Paperwork in orderA report and an operating log entry after every visit.
  • All WWTP brandsWe also inspect plants from other manufacturers.
  • All of SlovakiaWestern Slovakia regularly, elsewhere by agreement. Advice also online via WhatsApp.
  • Service after the warranty, tooWe look after your plant for years after start-up.
  • Since 200026 years of experience with wastewater treatment plants.

Book your inspection in good time

Demand for inspections is highest in the run-up to the 30 January deadline. It is best to get in touch early. +421 905 229 394