Frequently asked questions about wastewater treatment plants

We have collected the questions we are asked most often. If you cannot find your answer here, call us on +421 905 229 394 or email us at info@bednarmontaze.sk.

?
On this page

Choosing a WWTP and how it works

How does a domestic wastewater treatment plant (WWTP) work?

The wastewater is treated by the bacteria in activated sludge. The water passes through mechanical pre-treatment, a zone without oxygen where nitrates are removed, and an aerated zone where the bacteria break down the pollution. In the settling zone, the sludge separates out and the treated water flows away. More →

What size of WWTP do I need?

The size is given in population equivalent (PE, Slovak EO). In a family house, one PE roughly corresponds to one permanent resident. For a family of four, a WWTP for 4 to 6 people is usually chosen.

How do I choose a wastewater treatment plant?

Check how long the company has been in business and whether it has references. The WWTP must have CE marking and a declaration of performance under the standard STN EN 12566-3, in the category your authority requires. It is an advantage if the supplier can also arrange the design, the hydrogeological assessment (hydrogeologický posudok), transport, installation and servicing.

What does CE marking on a treatment plant mean?

With it, the manufacturer confirms that the plant has been tested under the harmonised standard STN EN 12566-3 and that its parameters are stated in the declaration of performance. A product with CE marking may be sold throughout the European Union.

What do categories I, II, III, +P and +D mean?

These are categories of small WWTPs under Government Regulation No. 269/2010 Coll. Category I removes organic pollution, II also ammonia, III also total nitrogen, +P additionally phosphorus, and +D also includes disinfection. The district office (okresný úrad) sets the required category in your permit. More →

Does a WWTP smell?

A properly working treatment plant does not smell. An odour means that conditions without oxygen have developed in part of the plant, most often because of a faulty air blower or too much sludge. A drainage vent taken above the roof of the house (soil vent pipe) also helps. More →

What does the effluent look like when a WWTP is working properly?

It is clear, with no turbidity and no odour.

What happens during a power cut?

The plant temporarily works as a settling tank, and the drains do not block. Once the power is back, the blower starts up again and treatment continues.

Does a WWTP need protection in winter?

No, as long as wastewater flows into it and the blower is running. A plant in operation does not ice up. If nothing flows into the plant for a longer period, bacterial activity slows down at low temperatures.

Can a WWTP cope when you have guests?

Yes. According to the manufacturer, the domestic plants we supply can cope with a short-term overload of up to 100% for no more than two weeks.

Permits and legislation

Do I need a permit for a WWTP?

Yes. The discharge of treated water is permitted by the district office, department of environmental care (odbor starostlivosti o životné prostredie), and you then operate the plant according to its decision. We can arrange the design and handle the paperwork.

Where can I discharge the treated water?

Preferably into a watercourse. If that is not possible, into groundwater via a soakaway. Treated water can also be collected and used for garden watering if the permit allows it. There must always be a sampling point at the outlet.

When is a hydrogeological assessment needed?

When treated water is discharged into groundwater by infiltration. The assessment establishes whether the subsoil can take the water and whether groundwater would be put at risk. We can arrange the assessment for you anywhere in Slovakia.

Can I have a WWTP if there is a public sewer in my municipality?

As a rule, no. Where a public sewer has been built, a small treatment plant may only be used if connecting to it would be unreasonably costly in technical or economic terms.

What is a technical inspection (technická revízia) and how often is it done?

It is a mandatory check of a small treatment plant by a certified inspection technician (revízny technik). It is done once a year, or once every two years if the plant has remote monitoring. The result must be submitted to the district office by 30 January of the following year. More →

I have an older WWTP. Do I need to do anything?

Older plants must also have a technical inspection and an operating log (prevádzkový denník). If your WWTP was permitted under older regulations, you must apply by 31 December 2032 at the latest to have your discharge permit (povolenie na vypúšťanie) brought into line with current rules. More →

Ordering and placement

When should I order a WWTP if I do not know the excavation date yet?

As soon as possible. The delivery time is usually 2 to 4 weeks, and longer in the main season. We plan transport so that our vehicles are well loaded, which means a lower price for you. We then coordinate the delivery date with your excavation.

How long does placement take?

Placing a domestic WWTP itself usually takes a few hours once the excavation and the base slab are ready. The total time depends on the subsoil, the groundwater and the earthworks.

What if I have a high water table?

During placement, water must be pumped out of the pit, and the tank must be anchored or encased in concrete so that the water cannot push it up. Never empty such a plant completely afterwards. More →

Operation and service

How often does a WWTP need servicing?

We recommend a service visit at least once a year, or twice a year if the plant is under a heavier load. In addition, you need to arrange the technical inspection and the water analyses required by your permit. More →

How often does the sludge need to be removed?

Usually once every 6 to 12 months. A sludge test during the service visit shows exactly when it is needed. Only an authorised contractor (oprávnená osoba) may take the sludge away. More →

How much electricity does a WWTP use?

Most of it is used by the blower. With a power input of 50 to 60 W, that is about 440 to 530 kWh a year, or roughly €90 to €105 at €0.20 per kWh.

What does not belong in a treatment plant?

Fats and oils, wet wipes, sanitary products, medicines, paints and thinners, food waste, and large amounts of chlorine-based or aggressive cleaning products.

Do I need to add bacteria to my WWTP?

Not in normal operation, as the bacteria multiply in the plant by themselves. Bacterial additives can help at start-up, after the tank has been completely cleaned out or after a chemical shock. You will find them in our online shop ekotovar.sk (in Slovak).

Cesspools, grease traps and oil separators

Which is better, a cesspool (sealed holding tank) or a WWTP?

For a permanently occupied home, usually a WWTP. A household of four produces around 10 m³ of wastewater a month, so a cesspool would need emptying often. A cesspool makes sense where there is nowhere to discharge the water, or for a cottage that is rarely used. More →

How long must I keep proof of cesspool emptying?

If the municipality or the district office asks, you must present proof of emptying for up to the last two years. Only an authorised contractor may empty a cesspool, and the contents must be taken to a wastewater treatment plant.

When do I need a grease trap?

In restaurants, canteens, butcher’s shops and food production kitchens. The requirement is usually set by the public sewer operator. If you have your own treatment plant, a grease trap upstream of it is essential. More →

Does a car park need an oil separator?

It depends on the size and type of the surface and on where the water is drained to. The requirement is set by the design, the permit or the sewer operator’s conditions. More →

Prices and ordering

Where can I find current prices?

You will find prices for treatment plants, cesspools and spare parts in our online shop ekotovar.sk. We will send you the price for installation and servicing in a non-binding quote, usually promptly.

How does ordering work?

Fill in the quote request form or the service booking form, call us or send us an email. We will get back to you, clarify the details and agree a date. More →

Why choose Bednár Montáže

  • Since 200026 years of experience with wastewater treatment plants.
  • Everything from one companySales, design, permit, guides, service, inspection and parts.
  • Certified inspection technicianInspections are carried out by Daniel Bednár, who is on the Slovak University of Technology (STU) list of inspection technicians.
  • All of SlovakiaWestern Slovakia regularly, elsewhere by agreement. Advice also online via WhatsApp.

Can’t find your answer?

Call us or write to us. We are happy to advise. +421 905 229 394 · info@bednarmontaze.sk