2:32Video guides
See what domestic wastewater treatment plants look like in practice and how the excavation and placement are done. All the videos are from our YouTube channel.
The video loads from YouTube only after you click.
How to check your treatment plant yourself
Short animated guides you can follow without a technician. You can read about them in detail in the article Sludge test at home.
How to measure the sludge
Get ready
Put on gloves. Check that the air blower is running and that the surface in the aerated zone is bubbling.
Take a 1-litre sample
Take a sample from just below the surface in the aerated zone and pour it into a clear measuring cylinder.
Leave it to stand for 30 minutes
Place the cylinder on a level surface where it will not be shaken. The sludge flocs will start to sink to the bottom.
Read and record
After 30 minutes, read off the boundary between the sludge and the water and write the result in your operating log.
Compare the result
Compare the value with the operating manual. Pour the sample back into the aerated zone and wash your hands.
Four checks once a month
Safety first
Unplug the air blower before opening it, wear gloves and never climb into the tank.
1. Air blower and filter
It must run smoothly, without rattling. Tap or blow out the air filter, and replace it if it is very dirty.
2. Sludge test
Leave a 1-litre sample from the aerated zone to stand for exactly 30 minutes and write down the result.
3. Aeration and airlift pumps
In the large chamber the water should bubble evenly, as if boiling; in the settling zone it should only bubble gently. The valves are set by a technician.
4. What does not belong in a WWTP
No wet wipes, oils, medicines, paints or harsh chemicals. Spread out your laundry: two loads a day at most.
Domestic wastewater treatment plants
What treatment plants for family houses look like and how they work.
2:32
1:30Domestic treatment plant for up to 6 people
2:50WWTP for up to 6 people
1:04Small wastewater treatment plants
0:55Sewage treatment plant
2:59Sewage treatment plants
1:22Wastewater treatment plants
4:02WWTPs – wastewater and sewage treatment plants
0:20Wastewater treatment plant (WWTP)
1:06Treatment plants
0:35Wastewater treatment plant test
1:15WWTP cover for up to 6 people
WWTP excavation and installation
Digging the pit, casting the concrete slab and placing the plant, shown in practice.
Why choose Bednár Montáže
- Since 200026 years of experience with wastewater treatment plants.
- Everything from one companySales, design, permit, guides, service, inspection and parts.
- Certified inspection technicianInspections are carried out by Daniel Bednár, who is on the Slovak University of Technology (STU) list of inspection technicians.
- All of SlovakiaWestern Slovakia regularly, elsewhere by agreement. Advice also online via WhatsApp.


