How a wastewater treatment plant inspection works

The technical inspection (technická revízia) of a wastewater treatment plant (WWTP) is a check of the plant’s condition, its operation and its documentation. Allow roughly one to two hours on site. If you have your documents ready, it runs smoothly and no second visit is needed.

REPORT
On this page

Four steps

  1. 1BookingWe agree a date and tell you what to prepare.
  2. 2Technician’s visitOn-site check of the condition, the operation and the operating log.
  3. 3ReportYou receive the technical inspection report.
  4. 4Submission to the authorityThe report goes to the district office by 30 January.

What to prepare

  • the decision (rozhodnutie) of the district office (okresný úrad) on discharge, in other words your permit
  • the operating manual (prevádzkový poriadok) and the instructions for the plant
  • the declaration of performance (vyhlásenie o parametroch) or the CE marking
  • the report from the previous inspection, if you have already had one
  • water analysis reports
  • proof of sludge removal
  • the operating log (prevádzkový denník)
  • clear access to the lids and the air blower, which must be switched on

Missing something? Tell us when you book and we will advise you on how to fill the gaps.

What the inspection technician checks

The legal minimum consists of three things: a visual check of the plant’s condition, an assessment of its operation against the authority’s decision, and a check of the operating log. In practice, we look at things in more detail.

Documentation

Permit, operating manual, analyses, proof of sludge removal and the log.

Technical condition

Tank, partitions, lid, inlet, outlet and soakaway.

Process equipment

Air blower, aeration, airlift pumps, control unit and sludge compartment.

Sludge test

A settling test in a measuring cylinder shows whether the sludge needs to be pumped out.

Sample

Taking a sample, or checking that one has been taken as your permit requires.

Photo documentation

Photos of the plant’s condition as part of the inspection record.

What the report contains

  1. Identification of the plant, the owner and the permit.
  2. Documentation: what is in order and what is missing.
  3. Technical condition of the tank and the process equipment.
  4. Overall check of the plant’s operation.
  5. Photo documentation.
  6. Conclusions and measures, including deficiencies that must be remedied.

You submit the technical inspection report to the district office by 30 January of the following year. On request, we can do this for you.

What happens if the inspection finds deficiencies

Deficiencies must be remedied within 60 days of the inspection. The most common ones are:

  • missing or incomplete entries in the operating log
  • too much sludge and no proof of its removal
  • worn diaphragms (blower membranes) or uneven aeration
  • incorrectly adjusted recirculation
  • no way to take a sample at the outlet

We can resolve most of them straight away during a service visit.

Remote monitoring: an inspection once every two years

Remote monitoring continuously tracks how the plant is running, for example the air blower, and sends an alert if there is a fault. A plant with remote monitoring only needs to be inspected once every two years.

Frequently asked questions

How long does the inspection take?

Allow roughly one to two hours on site, depending on the condition of the plant and the documents.

Do I need to be at home during the inspection?

We recommend it. The technician needs access to the plant and to your documents, and will explain the results to you at the end.

Is an inspection the same as servicing?

No. Servicing keeps the plant running. The inspection is a statutory check of its condition, operation and documentation. We can combine both in one visit.

Is an inspection the same as a water analysis?

No. An analysis determines the quality of the treated water. How often it is needed is set by your permit. More →

Why choose Bednár Montáže

  • Certified inspection technicianInspections are carried out by Daniel Bednár, who is on the Slovak University of Technology (STU) list of inspection technicians.
  • Paperwork in orderA report and an operating log entry after every visit.
  • All WWTP brandsWe also inspect plants from other manufacturers.
  • All of SlovakiaWestern Slovakia regularly, elsewhere by agreement. Advice also online via WhatsApp.
  • Service after the warranty, tooWe look after your plant for years after start-up.
  • Since 200026 years of experience with wastewater treatment plants.

Ready for your inspection?

We will agree a date with you by phone. +421 905 229 394