Refurbishing and upgrading an old WWTP
Many domestic wastewater treatment plants (WWTPs) have been in use for 15 or even 20 years. The tank is usually fine, but the process equipment is worn and the rules have become stricter in the meantime. An old WWTP often does not need to be replaced completely – upgrading it is enough.
On this page
When to consider a refurbishment
- The water analyses do not meet the limits in your permit.
- The plant often breaks down, smells or has cloudy effluent.
- More people live in the house than the WWTP was designed for.
- Your permit was issued under older regulations and has to be brought into line with current rules (zosúladenie povolenia) by 31 December 2032 at the latest.
- The authority requires a higher treatment category, for example III or +P in a protected water management area.
- The plant has no remote monitoring and you would like a technical inspection (technická revízia) only once every two years.
- There is no sampling point at the outlet.
What we can do
- Replacing the process equipment: aeration diffusers, air distributor, airlift pumps and internal pipework.
- A new air blower with an output matched to the type of plant. More →
- Adding phosphorus removal with a dosing unit for category +P.
- Modifying the outlet and the inspection chamber for sampling.
- Converting an old cesspool (sealed holding tank) or septic tank into a WWTP. →
- Replacing the whole WWTP if the tank is damaged or unsuitable. More →
Our process
- Site visit and diagnostics: we check the condition of the tank and the process equipment and carry out a sludge test and, if necessary, a water analysis.
- Proposed solution with a price: we compare repair, upgrade and a new WWTP so that you can decide.
- Permit: if the size, category or discharge point changes, or an old permit has to be brought into line with current rules, we prepare the documents for the district office (okresný úrad).
- Implementation: usually no major excavation is needed if the tank is in good condition.
- Adjustment and check: once the plant has become established, we verify the result with a water analysis.
What has changed in the regulations
- From 15 November 2022, an amendment to Government Regulation No. 269/2010 Coll. applies: categories of small WWTPs (I, II, III, +P, +D), new limits and operating rules, including the operating log (prevádzkový denník) and remote monitoring. The regulation set a deadline of 1 January 2024 for bringing plants into line.
- From 1 January 2023, every small WWTP must have a technical inspection under Section 53(2) of the Water Act (Act No. 364/2004 Coll.). More →
- By 31 December 2032, owners of plants permitted under older regulations must apply to have their permit brought into line with current rules (Water Act, Section 80f).
Frequently asked questions
Is it worth repairing an old WWTP, or should I buy a new one?
If the tank is watertight and undamaged, upgrading the process equipment usually works out cheaper than a new WWTP with excavation. If the tank is damaged or its capacity is unsuitable, we will recommend a new one. After the diagnostics, you will receive both options with prices.
Do I need a new permit?
That depends on the extent of the change. If the size, category or discharge point changes, this has to be dealt with by the district office. We check the procedure before any work starts.
Why choose Bednár Montáže
- Certified inspection technicianInspections are carried out by Daniel Bednár, who is on the Slovak University of Technology (STU) list of inspection technicians.
- Service after the warranty, tooWe look after your plant for years after start-up.
- Paperwork in orderA report and an operating log entry after every visit.
- Parts from our own online shopAir blowers, diaphragms and additives, average delivery 2.6 days.
- All of SlovakiaWestern Slovakia regularly, elsewhere by agreement. Advice also online via WhatsApp.
- Since 200026 years of experience with wastewater treatment plants.
Have your old WWTP assessed
We come out, assess the condition of your plant and propose the least expensive solution that meets the authority’s requirements. +421 905 229 394