WWTP service: maintenance, repairs and technical inspection

We look after your wastewater treatment plant (WWTP) so that it treats your wastewater reliably, does not smell and all your paperwork for the district office (okresný úrad) is in order. We service domestic and larger WWTPs across Slovakia.

  • Since 2000
  • Certified inspection technician
  • Service after the warranty, too
  • Report and operating log entry
On-site service
On this page

What we do for you

What the owner of a small WWTP must do by law

A small treatment plant is a plant for up to 50 population equivalent (PE, Slovak EO) with an inflow of less than 10 m³ a day – in practice, every domestic WWTP. Since 2023 these plants have been subject to stricter rules:

ObligationHow oftenLegal basis
Operation in line with the district office’s decision (rozhodnutie), the operating manual and the manufacturer’s recommendationsongoingGovernment Regulation No. 269/2010 Coll., Section 5a
Checks of the plant’s condition and functioning, maintenance and remote monitoring of its functioningas set out in the operating manualGovernment Regulation 269/2010, Section 5a
Operating log: maintenance, samples, sludge removal, faults and repairsongoingGovernment Regulation 269/2010, Section 5a
Sludge removal only by an authorised contractor, and records of itas needed, usually once or twice a yearGovernment Regulation 269/2010, Section 5a
Technical inspection (technická revízia) by a certified inspection technicianonce a year, or once every 2 years with remote monitoringWater Act (Act No. 364/2004 Coll.), Section 53(2)
Submitting the inspection results to the state water authority (orgán štátnej vodnej správy)by 30 January of the following yearWater Act, Section 53(2)
Remedying deficiencies found during the inspectionwithin 60 days of the inspectionWater Act, Section 53(2)
Sampling and analysisas set out in the permit; for WWTPs up to 50 PE usually once a year when discharging into a watercourse and twice a year with infiltrationGovernment Regulation 269/2010, Annex 7

If the obligations relating to the technical inspection are not met, the district office can impose a fine of up to €165 on a private individual and €500 to €3,300 on a company or sole trader.

If your plant was permitted under older regulations, you must apply to the district office for your discharge permit (povolenie na vypúšťanie) to be brought into line with current rules (zosúladenie povolenia) by 31 December 2032 at the latest. We can help you with this.

How a service visit works

  1. 1BookingFill in the form or write to us.
  2. 2Technician arrivesWe agree the date with you in advance.
  3. 3Check and adjustmentAir blower, sludge, oxygen and effluent.
  4. 4RecordService report and log entry.
  1. Blower: operation, noise, airflow, condition of the filter and diaphragms
  2. Aeration: even bubbling and the condition of the aeration diffusers
  3. Airlift pumps and air distributor: sludge recirculation and surface skimming
  4. Sludge test: how much sludge there is in the activation zone and whether desludging is needed
  5. Oxygen and effluent: oxygen measurement and the colour, turbidity and odour of the treated water
  6. Cleaning: coarse solids trap (screen basket), inlet, outlet and water surface
  7. Adjustment: valves and cycles adjusted according to the results
  8. Record: service report, entry in the operating log and recommendations

When to call straight away

  • There is a smell near the plant or from the drains in the house.
  • The blower is not running, hums differently from usual or overheats.
  • The effluent is cloudy, grey or contains sludge flocs.
  • There is thick foam or floating sludge on the surface.
  • The water level in the WWTP is higher than usual, or water is backing up into the drains.
  • The control unit alarm is on.

How much does WWTP servicing cost

We tell you the price of the service in advance, based on the type of plant and the distance. We confirm it by phone when you book, with no hidden charges.

Our service area

We work regularly in Western Slovakia and elsewhere in Slovakia by agreement. Write and tell us where your plant is located, and we will arrange a date. We can also sort out many things online via WhatsApp.

Frequently asked questions about WWTP servicing

How often should a WWTP be serviced?

We recommend at least once a year, or twice a year for guesthouses, plants used by more people and plants with sudden peak loads. In addition to servicing, the owner of a small WWTP must arrange a technical inspection once a year, or once every two years if the plant has remote monitoring.

What is the difference between servicing and a technical inspection?

Servicing keeps the plant running: checks, cleaning, adjustment and replacement of worn parts. A technical inspection is a statutory check carried out by a certified inspection technician. The technician checks the condition of the WWTP, its operation in line with the authority’s decision and the operating log, and issues a report that you submit to the district office by 30 January.

Do I have to keep an operating log?

Yes. It records maintenance, sampling and analysis reports, sludge removal, and any faults, repairs or exceptional events. The log can be on paper or electronic. When we service your plant, we record everything in it for you.

Why choose Bednár Montáže

  • Certified inspection technicianInspections are carried out by Daniel Bednár, who is on the Slovak University of Technology (STU) list of inspection technicians.
  • Service after the warranty, tooWe look after your plant for years after start-up.
  • Paperwork in orderA report and an operating log entry after every visit.
  • Parts from our own online shopAir blowers, diaphragms and additives, average delivery 2.6 days.
  • All of SlovakiaWestern Slovakia regularly, elsewhere by agreement. Advice also online via WhatsApp.
  • Since 200026 years of experience with wastewater treatment plants.

Book a WWTP service

Fill in the short form or call +421 905 229 394. We will confirm the date and the price by phone.