Adjusting a wastewater treatment plant

Correct adjustment decides whether a wastewater treatment plant (WWTP) meets its discharge limits or smells and carries sludge out with the effluent. The plant is adjusted so that every part of it gives the bacteria optimum conditions: as little oxygen as possible in the denitrification zone, enough oxygen in the nitrification zone and calm water in the settling zone.

From the factory, the plant is set up for clean water. Before seeding and during operation, the settings need to be checked and adjusted to the actual load.

Air supply to the zones
On this page

Target values

Part of the plantWhat happens thereDissolved oxygen
Denitrificationremoval of nitrates without air supply0.0–0.3 mg/l
Nitrification (aerated zone)breakdown of organic pollution and ammonia1.5–4.0 mg/l
Settling zonesludge settles, treated water flows outno aeration

The recommended amount of activated sludge is between 300 and 700 mg/l. We measure oxygen with an oxygen meter. We check the amount of sludge with a sludge test, in which a sample from the activation zone is left to settle in a measuring cylinder for 30 minutes.

Why the settings change over time

Conditions in a treatment plant are not constant. The amount and composition of the wastewater change, and so do the temperature of the water and its surroundings and the amount and properties of the activated sludge. That is why the external and internal recirculation, the aeration intensity and the blower timing need to be checked and adjusted from time to time.

The plant is designed to cope with changing conditions in line with the standard EN 12566-3. However, any departure from optimum conditions can reduce treatment efficiency and worsen the quality of the effluent. Setting the valves correctly ensures the basic water flows in the plant and suitable conditions for the activated sludge.

Air distributor

The air from the blower is split at the air distributor. The valves are usually labelled as follows:

  • P – air supply from the blower
  • A1, A2 – aeration (primary and main aerated zone)
  • R1 – external sludge recirculation from the settling zone to the activation zone
  • R2 – internal recirculation to the denitrification zone
  • D1, D2 – surface skimming and surface cleaning in the settling zone

The labelling may differ depending on the type of plant. The operating manual (prevádzkový poriadok) of your WWTP always applies.

Adjustment procedure

  1. Air blower check: it is running and no air is leaking from the air lines.
  2. Main aeration fully open, all other valves closed.
  3. Internal recirculation: we open the valve a little at a time until the water in the recirculation is visibly bubbling.
  4. External recirculation: we set it so that the amount pumped is roughly 3 to 4 times the total inflow.
  5. Surface skimming in the settling zone: valve slightly open.
  6. Primary aeration: gentle only.
  7. Surface cleaning: we open the valve only when there is floating debris on the surface.

After each change, we monitor the plant for several days and fine-tune the settings based on the results of the sludge test and the oxygen measurements.

When the WWTP needs readjusting

  • after seeding and during the establishment period
  • after desludging
  • when the number of people in the house changes
  • when the effluent is cloudy, sludge is floating or the plant smells
  • after replacing the air blower or its diaphragms (blower membranes)

Frequently asked questions

Can I adjust the WWTP myself?

You can make simple adjustments according to the operating manual. Without measuring oxygen and doing a sludge test, however, you are adjusting it blind. During a service visit, we measure and adjust the plant. More →

Why does the WWTP treat water less well after desludging?

After the sludge has been pumped out, there are fewer bacteria in the activation zone, and the plant needs several days to get back into balance. It helps to check and fine-tune the settings after desludging.

What if I am not sure about the settings?

Send us a photo of the air distributor and a short video of the tank via WhatsApp. We can advise on many things remotely, and if necessary, a technician will come in person.

Why choose Bednár Montáže

  • Up to 99% efficiencyFor the main parameters, according to the manufacturer’s data.
  • No corrosionAn all-plastic PP and PE tank that does not rust.
  • Air blower outside the tankQuiet running, up to 36 dB for the smallest plants according to the manufacturer.
  • Tested to EN 12566-3CE marking and declaration of performance.
  • Everything from one companySales, design, permit, guides, service, inspection and parts.
  • Copes with holidaysAlso tested with a slightly intermittent inflow.

Let us adjust your WWTP

We measure the oxygen and the sludge and set the air distributor so that the plant meets its discharge limits. +421 905 229 394