Hydrogeological assessment for a wastewater treatment plant
If the water from your wastewater treatment plant (WWTP) cannot flow into a stream, the remaining route is into the groundwater through a soakaway.
5 min readMany plots have no stream into which treated water could flow. The solution is often a soakaway. However, this is not simply the owner’s choice: it depends on the conditions on the plot, on the assessment and on the permit from the district office (okresný úrad).
Treated water from a small wastewater treatment plant (WWTP) is discharged into surface waters as a priority. It may only go into groundwater where discharge into a watercourse is not possible, and only through a soakaway. It must always be possible to take samples.
Government Regulation No. 269/2010 Coll. sets out these conditions in Section 5a. The specific requirements for your plot are set by the district office, department of environmental care (odbor starostlivosti o životné prostredie).
The basis is a hydrogeological assessment (hydrogeologický posudok). It shows how quickly the soil absorbs water, where the water table is and whether there are any wells nearby.
The most common types:
| Type | Where it is used |
|---|---|
| Soakaway chamber | Permeable subsoil and limited space |
| Soakaway crates | Larger-capacity soakaway spread over an area |
| Infiltration tunnels | Longer, shallower structure under a lawn |
| Infiltration drain | Permeable layer in a longer strip |
Which type is suitable follows from the assessment and the design. The dimensions depend on the amount of water and the permeability of the subsoil.
Important: Do not connect rainwater to the treatment plant’s soakaway. The soakaway would be overloaded and water could back up into the plant.
For discharge into groundwater, limit values in mg/l are set according to the plant category. A brief overview:
| Category | CODCr | BOD5 | TSS | NH4-N | Ntot |
|---|---|---|---|---|---|
| I | – | 40 | 40 | – | – |
| II | – | 40 | 40 | 20 | – |
| III | 125 | 40 | 40 | 15 | 25 |
Category +P also has a limit for total phosphorus of 4 mg/l. You will find what exactly applies to you in the district office’s decision (rozhodnutie).
For sources of up to 50 population equivalent (PE, Slovak EO), 2 samples a year are usually taken when discharging into groundwater. You will find more about sampling and the parameters on our page on WWTP water analysis.
A soakaway only works for many years if the water reaching it is genuinely treated. If sludge escapes from the plant, the pores in the soil clog and the soakaway stops taking water. That is why it is important to:
Our page on WWTP faults: symptoms and solutions also explains what causes cloudy effluent.
To get a better picture, imagine the water’s journey from the house to the soil:
Each of these points must be in line with the design. The height differences need to be thought through in advance so that the water flows by gravity. If the terrain does not allow this, pumping may be necessary.
If you think the soakaway is filling up or water is standing on the surface, do not wait. First check whether sludge is escaping from the plant, and send us photos of the inspection chamber.
No. Discharge of treated water into groundwater is permitted by the district office, and you usually need a hydrogeological assessment for it.
It can, but it must be larger or specially designed. In unfavourable conditions, the assessment may not recommend a soakaway.
Yes, treated water can be collected in a storage tank. The district office assesses the conditions for this solution in the permit. More on the options for the treated water on our treatment plants page.