How much a home sewage treatment plant costs

The price of a domestic wastewater treatment plant (WWTP) is not a single figure. It is made up of the plant itself, the work on your plot, the permits and the annual running costs. Here is what it includes and what affects it most.

€
On this page

What the price is made up of

ItemWhat affects it
The WWTP itselfnumber of people, treatment category, phosphorus dosing
Excavation and base slabsubsoil, connection depth, access for machinery
Placement and backfillwater table, anchoring or encasing in concrete
Design and permitdischarge method, hydrogeological assessment
Connectionsdistance from the house, electricity, air pipe
Running costselectricity, desludging, servicing, inspection, analyses

Price of the plant itself

These are indicative prices for domestic treatment plants in our online shop ekotovar.sk (in Slovak) as of 6 November 2026.

WWTPCategoryPrice from
for 4 peopleIII€998
for 4 peopleII€1,090
for 6 peopleIII€1,180
for 6 peopleII€1,398
for 6 peopleIII and +P€1,590

You do not choose the category by price. The district office (okresný úrad) sets it in the permit, depending on where the treated water will flow. That is why it pays to check the category before you order a plant. You will find more about sizing in our article on WWTP size.

Current prices and other sizes are in our online shop ekotovar.sk.

Excavation, base slab and placement

Customers usually do the excavation, the base slab and the placement of the tank themselves. We have a step-by-step guide for this. The cost of this work therefore depends mainly on whether you have your own machinery or hire a local digger operator.

The main things that push the costs up significantly are:

  • a high water table, when the pit has to be pumped dry and the tank anchored or encased in concrete
  • rocky ground
  • a deep connection that requires an extension riser
  • a long connection from the house or difficult access to the plot

Design and permit

Discharge of the treated water is permitted by the district office, department of environmental care (odbor starostlivosti o životné prostredie). For the application you usually need design documentation (projektová dokumentácia). If the water will flow into the groundwater through a soakaway, you will also need a hydrogeological assessment (hydrogeologický posudok). We can arrange both the design and the assessment for you and will state their price in a non-binding quote.

We describe the procedure in detail in our article on the WWTP permit.

Running costs after start-up

When making your decision, also think about the annual costs. The figures below are indicative.

ItemHow oftenIndicative cost
Electricity for the air blowercontinuously440 to 530 kWh per year, about €90 to €105 at €0.20/kWh
Desludgingusually once every 6 to 12 monthsdepends on your local emptying contractor’s prices
Servicingat least once a yearin the quote
Technical inspection (technická revízia)once a year, with monitoring once every 2 yearsfrom €129
Water analysisas set in the permitpackage with inspection from €179

You will find a more detailed overview in our article on WWTP running costs.

Take care when comparing quotes. For every price, check whether it includes the air blower, the plant cover, the blower cabinet and transport. A lower price may simply mean fewer items in the quote.

How to get an exact price

Send us the following details and we will prepare a non-binding quote for you:

  1. the number of people who will use the plant
  2. your town or village and the approximate location on your plot
  3. where the treated water could go
  4. photos of the plot or a simple sketch
  5. whether you know how high the water table is
  6. whether you already have a design or a permit

What is often left out of the budget

When planning, people focus on the price of the tank. The following items then only come up during the work:

  • an extension riser if the inlet from the house is deeper
  • concrete for the base slab and sand and gravel for the backfill
  • an electric cable, a cable duct and a residual current device (RCD) for the blower
  • pipework for the inlet, the outlet and the air
  • a blower cabinet and a plant cover, if they are not included in the price
  • an inspection chamber for sampling
  • a soakaway if the water will not go into a watercourse
  • transport to the site

If you go through these items in advance, you will not be caught out during construction.

Size and price go hand in hand

In category III, the difference between a plant for 4 people and one for 6 people is about €180. If you are on the borderline between two sizes, a larger plant gives you reserve capacity for visitors and for a new addition to the family. On the other hand, a plant that is too large will not receive enough wastewater, and the bacteria in it will not work well. So choose the size according to the actual number of people, not the lowest price.

Price is not the only criterion

A treatment plant will serve you for many years. Apart from the price, check whether it has CE marking and a declaration of performance, which spare parts are available and who will look after it after start-up. You will find the questions worth asking every seller in our article How to choose a WWTP.

The cost of maintenance also matters. You can order air blowers, diaphragms (blower membranes) and additives in our online shop, and we can advise on many things remotely, so you do not have to pay for a call-out unnecessarily.

Frequently asked questions

What is the lowest price for a domestic WWTP?

A domestic treatment plant for 4 people costs from €998 in our online shop. This is the price of the plant alone, without excavation, base slab, design and transport.

What affects the price most?

Most often the water table, the subsoil and the discharge method. These three things determine how demanding the excavation will be and whether you need a hydrogeological assessment.

Can I save money by doing the excavation myself?

Yes. Customers usually do the excavation, the base slab and the placement of the tank themselves. It is important to follow the procedure, especially backfilling while filling the tank with water.

Why choose Bednár Montáže

  • Since 200026 years of experience with wastewater treatment plants.
  • Everything from one companySales, design, permit, guides, service, inspection and parts.
  • Certified inspection technicianInspections are carried out by Daniel Bednár, who is on the Slovak University of Technology (STU) list of inspection technicians.
  • All of SlovakiaWestern Slovakia regularly, elsewhere by agreement. Advice also online via WhatsApp.

Would you like an exact price for your plot?

Write to us with the number of people and your town or village, and we will send you a non-binding quote. +421 905 229 394